The 35.5-kilometre (22.1 mi) Circle line forms an incomplete loop from Dhoby Ghaut in the Central Region of Singapore, north to Serangoon and Bishan, and south to HarbourFront, with a branch from Promenade to Marina Bay station which will be extended to HarbourFront in the future. The fully-underground circular route also makes several links with the other MRT lines. The line begins at Dhoby Ghaut station, which has an interchange with the North South and North East lines, going eastwards and paralleling Bras Basah Road and Raffles Boulevard, before joining the Circle line extension at Promenade, which also interchanges with the Downtown line. From Promenade station, the line goes northwards and towards the east, passing beneath the Kallang Basin. Between Stadium and Dakota, the line parallels Stadium Boulevard and Old Airport Road, then the line continues northwards and follows the route of Paya Lebar Road and Upper Paya Lebar Road between Paya Lebar (which interchanges with the East West line) and Tai Seng.

Extension: Stage 6[]

On 17 January 2013, the Land Transport Authority (LTA) announced 'Circle Line Stage 6' which will 'close the circle', set to be completed by 2025. The 4 km extension will run between Marina Bay and HarbourFront. The extension will connect commuters between the HarbourFront to Marina Bay stations and expand the rail network to the southern edge of the Central Business District. On 29 October 2015, LTA announced the station locations for Stage 6, with the working names of the stations being Keppel, Cantonment and Prince Edward. Tenders were called for construction between 2016 and 2017.

On 15 May 2017, the LTA invited the public to send in suggestions for names of the three MRT stations or propose to keep their current names. Keppel and Cantonment kept their names, while Prince Edward has been changed to 'Prince Edward Road'.

Construction of Stage 6 commenced in late 2017. A joint venture – by China State Construction Engineering (The Singapore branch) and Nishimatsu Construction – won the contract to build the new Keppel MRT station and its associated tunnels.

Circle Line logo
Station Name Chinese Name Tamil Name Code Other code
White dot Marina Bay 滨海湾 மரீனா பே CE2 NS27
White dot Bayfront 海湾舫 பே ப்ரண்ட் CE1 DT16
White dot Dhoby Ghaut 多美歌 டோபி காட் CC1 NS24 NE6
White dot Bras Basah 百胜 பிராஸ் பாசா CC2
White dot Esplanade 滨海中心 எஸ்பிளனேட் CC3
White dot Promenade 宝门廊 புரொமனெட் CC4 DT15
White dot Nicoll Highway 尼诰大道 நிக்கல் நெடுஞ்சாலை CC5
White dot Stadium 体育场 ஸ்டேடியம் CC6
White dot Mountbatten 蒙巴登 மவுண்ட்பேட்டன் CC7
White dot Dakota 达科达 டகோட்டா CC8
White dot Paya Lebar 巴耶利峇 பாய லேபார் CC9 EW8
White dot MacPherson 麦波申 மெக்பர்சன் CC10 DT26
White dot Tai Seng 大成 தை செங் CC11
White dot Bartley 巴特礼 பார்ட்லி CC12
White dot Serangoon 实龙岗 சிராங்கூன் CC13 NE12
White dot Lorong Chuan 罗弄泉 லோரோங் சுவான் CC14
White dot Bishan 碧山 பீஷான் CC15 NS17
White dot Marymount 玛丽蒙 மேரிமவுண்ட் CC16
White dot Caldecott 加利谷 கால்டிகாட் CC17 TE9
Bukit Brown 武吉布朗 புக்கிட் பிரவுன் CC18
White dot Botanic Gardens 植物园 பூ மலை CC19 DT9
White dot Farrer Road 花拉路 ஃபேரர் சாலை CC20
White dot Holland Village 荷兰村 ஹாலந்து வில்லேஜ் CC21
White dot Buona Vista 波那维斯达 புவன விஸ்தா CC22 EW21
White dot one-north 纬壹 ஒன்-நார்த் CC23
White dot Kent Ridge 肯特岗 கெண்ட் ரிஜ் CC24
White dot Haw Par Villa 虎豹别墅 ஹா பர் வில்லா CC25
White dot Pasir Panjang 巴西班让 பாசிர் பாஞ்சாங் CC26
White dot Labrador Park 拉柏多公园 லாப்ரடார் பூங்கா CC27
White dot Telok Blangah 直落布兰雅 தெலுக் பிளாங்கா CC28
White dot HarbourFront 港湾 துறைமுகம் CC29 NE1
Keppel 吉巴 கெப்பல் CC30
Cantonment 广东民 கெண்டொன்மன் CC31
Prince Edward Road 爱德华太子路 பிரின்ஸ் எட்வர்ட் ரோடு CC32
Circle Line map distinguished from the regular map.

Circle Line