Singapore MRT Wiki
Singapore MRT Wiki
NE17 PTC Punggol
榜鹅
பொங்கோல்

Not to be confused with the Punggol LRT Line



Punggol is both an underground and an above ground station. The underground section belongs to the North East Line and Cross Island Line (Future). Above ground is the Punggol LRT. This station acts as the Terminus for the North East Line for now, the other being HarbourFront.


History[]

Wikipedia logo
Most of this information is from Wikipedia
This information is mainly from Wikipedia. We use this information under the Creative Commons: Attribution-Share Alike (CC BY-SA 4.0).

Contract 712 for the constructing of Punggol NEL station was awarded to Hock Lian Seng Group at a contract sum of S$85.86 million. The government gave the green light to construct the North East line in 1996. The station was constructed in tandem with the developments of Punggol New Town in 1999. The site of the station was in the middle of the forest, which was eventually cleared to make way for the construction. A track road was created to transport people and equipment to the site.

In 2002, both of the LRT station and the MRT station were completed. Access roads of Punggol Central from Punggol Road were built at the same time. The station opened with the rest of the line in 20 June 2003. After finishing the construction of underground platforms at Punggol (at basement 2), construction began on the Punggol LRT in 2000, which had a middle platform on the LRT side (at level 2). The Punggol LRT station was opened on 29 January 2005 and served only the East Loop before the opening of the West Loop on 29 June 2014.

On 27 February 2020, a power fault along the NEL resulted in service disruptions to the Punggol, Sengkang and Buangkok stations. At 5:36 am, a shuttle train service was provided which operated on a single platform between the Punggol and Buangkok stations. In order to facilitate maintenance functions, the power source to the tracks between the Hougang and Punggol stations was switched off. Additionally, free regular and bridging bus services were provided to serve these stations. The repair works were completed by 11:49 am and usual service along the entire NEL resumed at 12:14 pm. Investigations later revealed that a broken contact wire affected the power source to trains launching from Sengkang Depot, causing the service disruptions.

Exits[]

  • Exit A: Waterway Point - Punggol Walk, Waterway Point, Punggol Watertown Condo, Punggol Waterway Park, HDB Waterway Terraces 1, HDB Waterway Terraces 2
  • Exit B: Punggol Central - Punggol Place, Punggol View Primary School, Fo Guang Shan Singapore, HDB Treelodge@Punggol, HDB Coralinus
  • Exit C: Bus Interchange - Punggol Bus Interchange, Punggol Place, Edgefield Primary School, Masjid Al-Islah, HDB Punggol Regalia, HDB Punggol Sails, HDB Punggol Crest, HDB Punggol Arcadia, HDB Punggol Grove, Parc Centros Condo, Privé Condo
  • Exit D: Punggol Walk - Punggol Walk, Punggol Green Primary School, A Treasure Trove condo, Twin Waterfalls condo, HDB Punggol Residences, HDB Punggol Sapphire, HDB Punggol Ripples, HDB Punggol Waves
North East Line logo
Any italicized stations are either planned, under construction or out of service.
Stations HarbourFront NE1 CC29Outram Park EW16 NE3Chinatown NE4 DT19Clarke Quay NE5Dhoby Ghaut NS24 NE6 CC1Little India NE7 DT12Farrer Park NE8Boon Keng NE9Potong Pasir NE10Woodleigh NE11Serangoon NE12 CC13Kovan NE13Hougang NE14Buangkok NE15Sengkang NE16 STC Punggol NE17 PTC Punggol Coast NE18
Depot Sengkang Depot